Ptarmigan
Site preprationÂ
The Ptarmigan project had a few challenge's the biggest was the 12-15 degree slope the site was located on.
Retaining wallsÂ
A two tiered retaining wall was constructed on the west side of the lot to create a large flat pad for construction and then became the driveway.
Foundations
Nearly all the materials needed to be hauled in by truck and trailer due to limited access and steepness of the road!
Construction
We worked with the home owner on this project to keep them onsite through the build, with some careful planning and scheduling.
Completion
This was a 2200 square foot addition plus 400 square foot remodel inside the current home to allow new and old to connect.